Modes Served Road, Rail |
Terminal Operator Logoprom |
Address 6, Konovalova St 6003127 Nizhny Novgorod Russia |
Contact Person Mrs. Yulia Ankudinova, Mr. Nikolai for Russian, Head of Transport Logistics PC |
Phone +7 (909) 288-25-38, +7 (985) 258-03-14 for Russian |
E-Mail ankudinova_ua@logoprom.ru |
Web http://www.logoprom.ru/eng/ |
Opening Hours Mo - Fr: 08:00 - 20:00 Sa: 08:00 - 20:00 So: 08:00 - 20:00 |
Additional Information Favorable geo-economic location and high transport accessibility: 5 km from the federal highway M7; Distance from Moscow - 400 km. The presence in a single complex of a full range of service of cargo handling and storage. Work with dangerous goods (2 - 6, 8, 9 classes) in tank containers, including tank-containers with liquefied hydrocarbon gas (LHCG). Formation of container trains on own railways. Organization of railway dispatch of loaded and empty containers within Russia and to the former Soviet countries and the countries of far-abroad. Organization of trucking of loaded and empty containers. |
Handling of Container | ||||||
Total Terminal Area 260000 m² | ||||||
Interim Storage 40000 m² 2600 TEU | ||||||
Rails 1 × 800 1 × 995 total number of tracks: 2 total usable length: 1795 m | ||||||
Reachstackers 2 × 45 t / 12 handlings per hour | ||||||
Interim Storage Capacity 2600 TUE | ||||||
Services
| ||||||
Other Services Washing/steaming of tank containers. One-time washing of 2 tank-containers, steam heating of 6 tank-containers. A system for cargo heating in a tank container before unloading. Repair and inspection of containers. Survey services for various types of cargo, including dangerous cargoes transported in containers and tank containers on any type of transport. Infrastructure, equipment, terminal capacity , 16 km (7 lines) of our own railways connected to Pochinki station GRW. Railway curves allow all type of platforms used in the railway network. Loading and unloading railway areas allow one-tome handling of 58 nominal railcars. 2 locomotives TGM-23V provide shunting operation and transportation of railway platforms with containers arriving as part of speed container trains from the station Pochinki GZD to the terminal and back. |